LogoLogo TaglineLogo Tagline
Loading...

Cost to Build Report for Plan 149020AND

Modern Farmhouse House Plan with Main-Level Master and Optional Bonus

Main Level

Plan 149020AND: Modern Farmhouse House Plan with Main-Level Master and Optional Bonus - Floor Plan - Main Level - Country, Craftsman, Modern Farmhouse, Ranch, Traditional

Main Level

2nd Floor

Plan 149020AND: Modern Farmhouse House Plan with Main-Level Master and Optional Bonus - Floor Plan - 2nd Floor - Country, Craftsman, Modern Farmhouse, Ranch, Traditional

2nd Floor

Optional Lower Level

Plan 149020AND: Modern Farmhouse House Plan with Main-Level Master and Optional Bonus - Floor Plan - Optional Lower Level - Country, Craftsman, Modern Farmhouse, Ranch, Traditional

Optional Lower Level

View Cost to Build Report Demo
A Cost to Build Report can be customized to help you estimate your construction costs.
The cost to build report provides a cost estimate based on location, home complexity, and features. After receiving the report (please allow 24 - 48 hours for delivery), you can customize it to align with your preferred building materials and plan features.
Cost to Build Reports are customizable and available for download for 60 days after delivery.
Material Quality
Better (Recommended)

Foundation
Basement

Build Lot Postal Code