LogoLogo TaglineLogo Tagline
Loading...

Cost to Build Report for Plan 444035GDN

Two-Story Cottage Plan with Stone and Shake Exterior

Main Level

First Level floor plan of a house with great room, kitchen, dining, master bedroom, garage, and porches, with dimensions listed for each room.

Main Level

Second Level with Opt. Finished Bonus Room

Second-story floor plan showing bedrooms, great room with skylights, dining, kitchen, bonus room, and porch with patio access.

Second Level with Opt. Finished Bonus Room

Main Level - Basement Foundation Option (+$ Paid Option)

First Level floor plan showing basement stairs, master suite with walk-in closet and master bath, plus great room, kitchen, dining, and garage.

Main Level - Basement Foundation Option (+$ Paid Option)

View Cost to Build Report Demo
A Cost to Build Report can be customized to help you estimate your construction costs.
The cost to build report provides a cost estimate based on location, home complexity, and features. After receiving the report (please allow 24 - 48 hours for delivery), you can customize it to align with your preferred building materials and plan features.
Cost to Build Reports are customizable and available for download for 60 days after delivery.
Material Quality
Better (Recommended)

Foundation
Crawl

Build Lot Postal Code