LogoLogo TaglineLogo Tagline
Loading...

Cost to Build Report for Plan 39278ST

3-Bed Country Home Plan with First Floor Master Suite

Main Level

Plan 39278ST: 3-Bed Country Home Plan with First Floor Master Suite - Floor Plan - Main Level - Cape Cod, Country

Main Level

Second Level

Plan 39278ST: 3-Bed Country Home Plan with First Floor Master Suite - Floor Plan - Second Level - Cape Cod, Country

Second Level

Basement Unfinished

Plan 39278ST: 3-Bed Country Home Plan with First Floor Master Suite - Floor Plan - Basement Unfinished - Cape Cod, Country

Basement Unfinished

View Cost to Build Report Demo
A Cost to Build Report can be customized to help you estimate your construction costs.
The cost to build report provides a cost estimate based on location, home complexity, and features. After receiving the report (please allow 24 - 48 hours for delivery), you can customize it to align with your preferred building materials and plan features.
Cost to Build Reports are customizable and available for download for 60 days after delivery.
Material Quality
Better (Recommended)

Foundation
Basement

Build Lot Postal Code